FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD

Manufacturer from China
Active Member
7 Years
Home / Products / Climbing Formwork System /

High Efficient F16 Cantilever Formwork System For For Large Area Concrete Pouring

Contact Now
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Country/Region:china
Contact Person:MissLiu
Contact Now

High Efficient F16 Cantilever Formwork System For For Large Area Concrete Pouring

Ask Latest Price
Brand Name :ForPro
Model Number :Light weight climbing formwork system
Certification :IOS and CE
Place of Origin :China
MOQ :100 pcs
Payment Terms :L/C, T/T
Supply Ability :100000 Pcs / year
Delivery Time :30-45 work days
Packaging Details :Pallet
Material :Q235 steel,wood beam,plywood
Color :Silver, brown, light yellow
Size :45 KN per bracket
Application :LNG Tank, Silo, shiplock, high piers
Product name :Light weight climbing formwork F16 system
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

LNG Concreting Large Area to be Built by F16 Cantilever Formwork System

Description

The cantilever climbing formwork, F16, is mainly used for large-area concrete pouring, such as for dams,high piers, nuclear power plant project, LNG tank and silo project etc...The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.

Elements
• Timber beam H20 large size formwork

• Light weight climbing brackets F16

• Panel travelling unit can trave formwork 700mm away from concrete

• Anchoring system 15.0 with high loadability

Features
• Main Platform is 1.60 wide for safe operation

• Formwork can be moved back 700mm from concrete surface

• 3 levels of platform provide orient operation space

• High capacity of 45KN verticle load per bracket and bracket

Applications Field

• LNG Tank Projects

• Nuclear power plant projects

• Silo projects

• Storage tank projects

High Efficient F16 Cantilever Formwork System For For Large Area Concrete Pouring

FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.

Q 2.Do you have strong techinicans teams?
Yes,We have 9 project designers, 4 product development engineers and 10 technical guidance engineers. The whole team has more than 20 years of engineering experience

Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.

Q 4. What is your production capacity?
3000Tons per month.

Q 5. Do you have test report?
Yes, we have done many test in Famous university--Hefei University of Technology.

Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.

Inquiry Cart 0